ENGINEERING DOWNLOADS & DOCUMENT REQUESTS

Pancake Load Cell Resources & Engineering Documents

Download ten selection, mounting and calibration workbooks. Request native STEP, released datasheets and unit records with the configuration or serial needed to identify the correct documents.

10 available files · PDF / CSV · no account required

Choose a workbook for the force range and interface.

These original planning documents help you prepare a clear pancake load cell request. Each download identifies its scope. A configuration brief records the questions for engineering; final dimensions and rated performance belong to the approved part and revision.

PDF · 11.7 KB · WORKBOOK

Family selection workbook

Compare requested force ranges, load directions and interface review inputs.

Cross-family planning · Reviewed 2026-10-27 · 2 PDF pages

Download PDF ↓
PDF · 13.1 KB · WORKBOOK

Calibration evidence workbook

Request the measurement procedure, uncertainty chain and serial-specific documents.

Cross-family planning · Reviewed 2026-10-27 · 2 PDF pages

Download PDF ↓
CSV · 0.9 KB · WORKBOOK

Blank five-point measurement plan

Plan zero / 25 / 50 / 75 / 100% points; all measured fields are blank.

Cross-family planning · Reviewed 2026-10-27 · Editable CSV

Download CSV ↓
CSV · 0.5 KB · WORKBOOK

Mechanical interface review sheet

Record original and proposed dimensions separately, with drawing revisions.

Cross-family planning · Reviewed 2026-10-27 · Editable CSV

Download CSV ↓
PDF · 9.6 KB · WORKBOOK

Mounting & wiring review guide

Plan the flange joint, thread engagement, four/six-wire chain and shunt check.

Cross-family planning · Reviewed 2026-10-27 · 1 PDF page

Download PDF ↓
Download now / configuration review / serial review

Match the document to its release stage.

Document availability and the inputs needed for each request.
DocumentAvailabilitySend with the request
Selection, mounting and calibration workbooksDownload aboveUse the blank fields to plan your force range, fixture and measurement chain.
Released 2D drawing, native STEP and datasheetRequest for the reviewed partFamily, force/direction, center thread or both flange faces, mounting envelope and full original model if replacing a unit.
Pin assignment, shunt and amplifier configurationConfirm for the actual signal chainBridge version, connector, cable revision, excitation, acquisition interface and required bandwidth.
Actual calibration certificate and archived unit recordsSerial-specific archive checkExact engraved serial, approximate calibration date and the records needed. Availability is checked before release.

Keep the drawing revision with the installed measurement chain.

Compare cell-only height with the complete base/button stack. Check the bolt circle, hole count, thread pitch and engagement, counterbores, locating pilots and cable clearance. For a retrofit, retain the original manufacturer drawing alongside the proposed revision. A photograph or a matching outer diameter cannot settle these checks.

Compare original source dimensions ↗

Use measured unit records for acceptance.

The blank five-point CSV contains planning fields rather than measured results. A workbook cannot establish calibration uncertainty, an IP rating, fatigue life or testing-machine conformity. Request the actual serial, reference standard, procedure and complete sensor/fixture/amplifier configuration for the result you need.

Review calibration and certificate scope ↗
Review flange mounting and wiring ↗

Published and reviewed 2026-10-27 · Responsible publisher: Magatom Dynamics Co., Ltd.